<?xml version="1.0" encoding="utf-8" standalone="no"?>
<?xml-stylesheet type="text/xsl" href="eadcbs2.xsl"?>
<!DOCTYPE ead SYSTEM "ead.dtd">

<!-- Sample encoding for an EAD finding aid -->
<!-- Andrew Lacey 1/04 -->
<!-- Order of fields in this document is not related to order of fields on web page.
	To change the web page layout, the style sheet (eadcbs2.xsl) must be edited. -->
<!-- To get a logo to display on the web page, save your image as yourlogo.gif in the
	same directory as these files. -->

<ead>
    <eadheader>
        <eadid countrycode="us" mainagencycode="Nj-MO" publicid="HM5">
        </eadid>
        <filedesc> <titlestmt>Morris Area Environmental Action Reports, 1995-2003.<titleproper>Finding Aid to the Morris Area Environmental Action Reports, 1995-2003</titleproper> </titlestmt> </filedesc>
    </eadheader>
    <frontmatter>
        <titlepage>
            <titleproper>Finding Aid to the Morris Area Environmental Action Reports, 1995-2003. </titleproper> 
            <publisher>North Jersey History and Genealogy Center</publisher> <address> <addressline>The Morristown and Morris Township Library</addressline> <addressline>One Miller Road</addressline>
<addressline>Morristown, NJ 07960</addressline>
			</address>
        </titlepage>
    </frontmatter>
    <archdesc level="collection">
        <did>
            <head>Overview of Collection</head>
            <origination label="Creators:">Clean Venture, Langan Engineering and Environmental Services, Inc. and CH2M HILL, Inc.</origination>
            <unittitle label="Call Number:"> <title render="bold">HM1 MORR ENV</title> </unittitle>
            <unittitle label="Title:">Morris Area Environmental Action Reports,</unittitle>
            <unitdate label="Date:" type="inclusive">1995-2003.</unitdate>
            
            <physdesc label="Quantity:">
                <extent>2.5 Linear Feet in five MSS boxes. </extent>
            </physdesc>
        </did>
        <bioghist>
            <head>History of the Former Morristown Gas Works Site, Goldere Junkyard and Hanover Compression Station.</head>
            <p><title render="bold">Former Morristown Gas Works Site</title></p>
            <p>When local utilities merged in the late 1920’s, Public Service Electric and Gas Company (PSE&amp;G) inherited many manufactured gas facilities, one of which being the Morristown Gas Works Site.  Formerly known as the Morristown Gas Light Company, gas manufacturing operations were conducted on what is referred to as parcel 3 from approximately 1886 until 1918.  The facilities and buildings were later destroyed, and PSE&amp; G was forced to initiate a site clean-up program when pollutants were found below the New Jersey Department of Environmental Protection standards.  The contaminants were believed to be left over from the former manufacturing facilities, at a time when toxic waste was simply dumped on site.</p>
            <p><title render="bold">Goldere Junkyard</title></p>
            <p>In September of 1989, the town of Morristown proposed foreclosure of the Goldere Junkyard, located on Coal Avenue.  Initially, it was due to non payment of taxes and it was stated that nearly $80,000 was owed to the town in back taxes.  Considered one of the areas worst eyesores, both residents and town officials voiced major concerns about the junkyards close proximity to homes and the Whippany River. The town council voted for a “Clean &amp; Lien” operation to remove debris and contaminants.  The foreclosure would follow.  The environmental consultant, Clean Venture, assessed the site and identified the parcel as a major hazardous waste site. PSE&amp; G owned part of the site and agreed to test for further contaminants due to the process of lighting gas.</p>
            <p><title render="bold">Hanover Compression Station</title></p>
            <p>In 1985, Algonquin Gas Transmission Comapny and Texas Eastern Transmission Corporation replaced two stationary combustion turbines on the site of the old Hanover Compression Station with safer and more modern equipment.  The original unit was not equipped with the proper emissions control technology and, given the demand for the most ecological gas, the proposed changes were greatly needed.  The new turbines would have greater capacity and be 17% more fuel efficient than the former turbines and in turn, would lessen the environmental impact. </p> 
            <head>Sources:</head>
            <p>Batallas,Tanya; <title render="italic">PSE&amp;G will spend $1.2B to clean up N.J. sites.</title> 7 Aug.2009. www.nj.com/business/index.ssf/2009/08/pseg_will_spend_12b_to_clean_u.html.Accessed on June 1, 2012.</p>
            <p><title render="italic">Goldere’s Junkyard</title>; Bierce Riley, April 16, 1990. Located in the NJHGC, <title render="bold">HM6 Gold Ril</title>.</p>
        
        
        
        </bioghist>
        
        
        <scopecontent>
            <head>Scope and Content of the Records</head>
            <p>The collection contains reports detailing the remedial investigations performed by Clean Venture, Langan Engineering and CH2M Hill Inc. for Public Service Electric and Gas Company (PSE&amp;G).  Investigations were made in response to the environmental concerns for the former Morristown manufactured gas site and Goldere Junkyard in Morristown.  Included are site maps, photographs, analytical data, and work plans for the reconstruction of the affected areas.  The bulk of the material spans from 1995-2003.  The collection also contains material pertaining to the Hanover Compressor Station Upgrade applied by The Algonquin Gas Transmission Company and Texas Eastern Transmission Corporation.  The report details the proposed project as a response to the increased demand for the use of natural gas. The additional material that follows includes maps, photographs, plot plans and permits which better help to understand the necessity for such an upgrade.</p> 
        </scopecontent>
        
        <arrangement>
            <head>Arrangement of the Records</head>
          
            </arrangement>
            <arrangement>
                <head>Series I: Former Morristown Gas Works, 1995-2003.</head>
                <p>This series was arranged in the manner in which it was recieved. It contains reports detailing the remedial and interim workplans for the former Morristown Gas Works Site and is not always in chronological order.  The bulk of material that follows are site maps that show proposed excavations and restorations as well as important geographic and geological concerns.  Documents include but are not limited to permits, tables, pre and post construction photographs and soil and groundwatering sampling analysis.</p>
            </arrangement>
            <arrangement>
                <head>Series II: Goldere Junkyard and Hanover Compressor Station Upgrade, 1999-2001.</head>
                <p>This series contains material relating to both the Goldere Junkyard and the Hanover Compressor Station Upgrade.  Each are arranged in a similar manner and are not always in chronological order.  The reports outline the history, purpose and plans for both the cleanup of the Goldere Junkyard and the upgrade for the Hanover Compression Station.  The material that follows are documents pertaining to the pre and post cleanup and construction plans.  Documents include but are not limited to correspondence, site maps, photographs, environmental reports, and soil erosion control plans.  Included as well is a noise study submitted by Hoover &amp; Keith Inc. in order to meet the applicable sound level standards for the proposed replacement turbines at the Hanover Compression Station.</p>
            </arrangement>
         
        
        <descgrp>
            <accessrestrict>
                <head>Important Information for Users of the Collection</head>
                <p>These records are open to researchers. Records may be copied for use in individual scholarly or personal research, however, as with all materials in the
                    North Jersey History and Genealogy Center researchers are responsible for obtaining copyright permission to use material from the collection. Material 
                    in the Morris Area Environmental Action Reports, 1995-2003, may be photocopied, but because this material is a permanent part of the History Center's 
                    collections, researchers are advised to photocopy with care, using only the edge copier for bound material.
                </p>
            </accessrestrict>
            <acqinfo>
                <head>Acquisition Information</head>
                <p>The Morris Area Environmental Action Reports, 1995-2003 were deposited in the library.</p>
                <p> These records have been made publicly available under the New Jersey Open Public Records Act. Passed in 2001 by the New Jersey State Legislature, this 
                    Act expands upon an individual's rights for free access to governmental records.  Effective on July 7, 2002, the New Jersey Department of Environmental 
                    Protection (NJDEP) was required to implement the New Jersey Open Public Records Act, or OPRA.  The law states, "government records shall be readily
                    accessible for inspection, copying, or examination by the citizens of this state." </p>
            </acqinfo>
            <prefercite>
                <head>Preferred Citation</head>
                <p>Finding Aid to the Morris Area Environmental Action Reports, 1995-2003. North Jersey History and Genealogy Center, The Morristown and Morris Township
                   Library.</p>
            </prefercite>
            <processinfo>
                <head>Processing Information</head>
                <p>Finding Aid arranged, described and encoded by Samantha Insetta, North Jersey History and Genealogy Center Intern, Spring 2012.</p>
            </processinfo>
        </descgrp>
        
        <dsc type="combined"> <head>Container List</head> 
            
            <c01 level="series"> <did> <unittitle>Series I: Former Morristown Gas Works Site, </unittitle> <unitdate
                type="inclusive">1995-2003.</unitdate> </did> 
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">1</container>
                    <unittitle>Remedial Action Report: Former Morristown Gas Works Parcels 3 &amp; 4,  </unittitle> <unitdate
                        type="inclusive">1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">2</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Site Location Map,  </unittitle> <unitdate
                        type="inclusive">October 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">3</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Site Plan,    </unittitle> <unitdate
                        type="inclusive">1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">4</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Pre-Remediation Soil Sampling Results Parcel 3,   </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">5</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Pre-Remediation Soil Sampling Results Parcel 4,   </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">6</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Extent of Soil Remediation, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">7</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Post-Excavation Soil Sample Results,  </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02> 
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">8</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Site Improvement Plan,  </unittitle> <unitdate type="inclusive">July 1996.</unitdate> </did></c02>  
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">9</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Pre and Post Remediation Groundwater Sampling Results,   </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">10</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Geologic Cross Section 8A,   </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">11</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Geologic Cross Section 8B,  </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">12</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Groundwater Contour Map, Shallow Zone, 28 February to 15 July 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">13</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Groundwater Countour Map, Deep Zone, 15 July 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">14</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Shallow Groundwater Contour Map, 28 February 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">15</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Groundwater Countour Map, Shallow Zone, 6 March 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">16</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Groundwater Contour Map, Shallow Zone, 3 April 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">17</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Groundwater Contour Map, Shallow Zone, 30 April 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">18</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Groundwater Contour Map, Shallow Zone, 6 June 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">19</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Groundwater Contour Map, Shallow Zone, 15 July 1996, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02> 
                <c02 level="file"><did> <container id="box1" type="box">1</container>
                    <container parent="box1" type="folder">20</container>
                    <unittitle>Former Morristown Gas Works Remediation Project: Areas of Proposed Additional Excavation, </unittitle> <unitdate
                        type="inclusive">July 1996.</unitdate> </did></c02>
                Box 2
                
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">1</container>
                    <unittitle> Appendix A: Access Agreements Parcel 3 &amp; 4, </unittitle> <unitdate
                        type="inclusive">September 1990- June 1992.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">2</container>
                    <unittitle>Appendix B Permits: UST Registration Certificate, UST Closure Approval, Stream Encroachment Permit, Soil Erosion and Sediment Control Plan, Hydrant Use Permit, Construction Permit, Electrical Permit, </unittitle> <unitdate
                        type="inclusive">March 1993.</unitdate> </did></c02>   
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">3</container>
                    <unittitle>Appendix C: Monitoring Well Abandonment Reports, </unittitle> <unitdate
                        type="inclusive">August 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">4</container>
                    <unittitle>Appendix D: Photographs, Before and After Restoration, </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">5</container>
                    <unittitle>Appendix E: Structural Survey of Parcel 4 Buildings, Johnson Engineers Report, </unittitle> <unitdate
                        type="inclusive">August 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">6</container>
                    <unittitle>Appendix F: Air Monitoring and Fugitive Dust Measurement Charts, </unittitle> <unitdate
                        type="inclusive">August-October 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">7</container>
                    <unittitle>Appendix G: Underground Utility Reports: Geophysical Investigation Report, Active/Inactive Distribution Mains, </unittitle> <unitdate
                        type="inclusive">September 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">8</container>
                    <unittitle>Appendix H: UST Disposal Information: Analytical data for UST contents, hazardous waste manifests for UST product, hazardous waste manifests for UST MGP residuals and cleanout rinsate, hazardous waste manifests for soil and remnant materials , </unittitle> <unitdate
                        type="inclusive">August-October 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">9</container>
                    <unittitle>Appendix I: Scrap Iron and Metals Recycling Receipts: USTS, piping, and fencing, </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
            <c02><did> <container id="box2" type="box">2</container>
                <container parent="box2" type="folder">10</container>
                <unittitle>Appendix J: NJDEP Notification of UST Closure/ UST Facility Questionnaire, </unittitle> <unitdate
                    type="inclusive">August 1995-January 1996.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">11</container>
                    <unittitle>Appendix K: Manifests- Decontamination Fluids and Excavation Dewatering, </unittitle> <unitdate
                        type="inclusive">October-November 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">12</container>
                    <unittitle>Appendix L: Concrete Rubble Disposal-Bills of Lading, </unittitle> <unitdate
                        type="inclusive">August-October 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">13</container>
                    <unittitle>Appendix M: Soil Disposal, </unittitle> <unitdate
                        type="inclusive">September-October 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">14</container>
                    <unittitle>Appendix N: Clean Fill Certification and Receipts, </unittitle> <unitdate
                        type="inclusive">February-October 1995.</unitdate> </did></c02>    
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">15</container>
                    <unittitle>Appendix O: Backfill Compaction Tests, </unittitle> <unitdate
                        type="inclusive">November-December 1995.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">16</container>
                    <unittitle>Appendix P: Monitoring Well Installation and Test Borings: Logs, Forms, and Records, </unittitle> <unitdate
                        type="inclusive">March-September 1996.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">17</container>
                    <unittitle>Appendix Q: Disposal During Monitoring Well Installation, </unittitle> <unitdate
                        type="inclusive">March-July 1996.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">18</container>
                    <unittitle>Appendix R: Data Validation Reports, </unittitle> <unitdate
                        type="inclusive">April-October 1996.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">19</container>
                    <unittitle>Interim Remedial Action Work Plan for Parcel 2 and Remedial Action Work Plan for Parcels 3 and 4 for the Former Morristown Gas Works, </unittitle> <unitdate
                        type="inclusive">June 2000.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">20</container>
                    <unittitle> Former Morristown Gas Works Site: Figure 1 Site Plan [1 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box2" type="box">2</container>
                    <container parent="box2" type="folder">21</container>
                    <unittitle> Former Morristown Gas Works Site: Figure 2 Parcel 2 Soil Exceedence Map [2 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                Box 3
                
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">1</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 3 Parcel 3 &amp; 4 Soil Exceedence Map [3 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">2</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 4 Groundwater Contour Map and Groundwater Exceedence Map [4 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">3</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 5 Delineation of Soil and Sediment Containing Tar-Like Material [5 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">4</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 6 Area of PAH Contamination less than 2 feet deep [6 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">5</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 7 Area of PAH Contamination greater than 2 feet deep [7 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">6</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 8 Geological Cross Section A-A' [8 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">7</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 9 Areas to be Excavated [9 of 11], </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">8</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 10 Area of Lead Contamination from 0 to 10 feet, </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">9</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 11 Parcel 2 Phase 11 Excavation Plan, Sections and Details, </unittitle> <unitdate
                        type="inclusive">May 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">10</container>
                    <unittitle>Interim Remedial Action Workplan Addendum for Parcel 2 and Remedial Action Workplan Addendum for Parcel 4 of the Former Morristown Gas Works with Table, </unittitle> <unitdate
                        type="inclusive">May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">11</container>
                    <unittitle> Former Morristown Gas Works Site: Appendix A: Deed Notice with Attached Maps of Affected Areas Block 3502, Lots 1 and 2, </unittitle> <unitdate
                        type="inclusive">April-May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">12</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix B: Goldere Junkyard Final Decision Document, </unittitle> <unitdate
                        type="inclusive">October 1999.</unitdate> </did></c02>   
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">13</container>
                    <unittitle> Former Morristown Gas Works Site: Appendix C: Overall Site Plan [1 of 5], </unittitle> <unitdate
                        type="inclusive">August 2000.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">14</container>
                    <unittitle> Former Morristown Gas Works Site: Appendix C: Goldere Site Final Cover Pre-Disturbance Topographic Map. 1996. [2 of 5], </unittitle> <unitdate
                        type="inclusive">May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">15</container>
                    <unittitle> Former Morristown Gas Works Site: Appendix C: Site Plan for Goldere Site Final Cover [3 of 5] , </unittitle> <unitdate
                        type="inclusive">May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">16</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix C: Goldere Site Final Cover Cross Sections [4 of 5], </unittitle> <unitdate
                        type="inclusive">May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">17</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix C: Goldere Site Final Cover Construction Details and Calculations [5 of 5], </unittitle> <unitdate
                        type="inclusive">May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">18</container>
                    <unittitle>Former Goldere Junkyard Site: Figure 1: Site Location Map Parcel 4 and the Former Goldere Junkyard Site [1 of 5], </unittitle> <unitdate
                        type="inclusive">April 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">19</container>
                    <unittitle>Figure 2: Site Plan Parcel 4 Block 3502, Lots 1 and 2 [2 of 5], </unittitle> <unitdate
                        type="inclusive">April 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">20</container>
                    <unittitle>Figure 3: Site Plan- Goldere Property Block 3502, Lot 1 [3 of 5], </unittitle> <unitdate
                        type="inclusive">April 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">21</container>
                    <unittitle>Figure 4: Remedial Investigation Sample Locations and Analytical Results Map- Parcel 4 [4 of 5], </unittitle> <unitdate
                        type="inclusive">May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">22</container>
                    <unittitle>Figure 5: Monitoring Well and Sampling Point Location Map- Goldere Junkyard Site [5 of 5], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">23</container>
                    <unittitle>Interim Remedial Action Report for Parcel 2 and Remedial Action Report for Parcels 3 and 4 of the Former Morristown Gas Works Site, </unittitle> <unitdate
                        type="inclusive">December 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">24</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 1: Site Location Map [1 of 5], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">25</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 2: Overall Site Plan [2 of 5], </unittitle> <unitdate
                        type="inclusive">October 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">26</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 3: Post-Excavation Sample Locations Parcel 2 [3 of 5], </unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">27</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 4: Spring Hill Property Test Pit/Delineation Sample Locations and Analytical Results [4 of 5], </unittitle> <unitdate
                        type="inclusive">November 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">28</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 5: Post-Excavation Sample Locations Parcel 3 and 4 [5 of 5], </unittitle> <unitdate
                        type="inclusive">May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">29</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix B: Backfill Documentation, </unittitle> <unitdate
                        type="inclusive">March-May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box3" type="box">3</container>
                    <container parent="box3" type="folder">30</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix C: Access Agreements, </unittitle> <unitdate
                        type="inclusive">January 2001.</unitdate> </did></c02>
                Box 4
                
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">1</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix D: Permits, </unittitle> <unitdate
                        type="inclusive">September 2000-May 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">2</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix E: Photographs of Restoration of Whippany River and Parcels 2, 3 and 4, </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">3</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix f: Perimeter Air Monitoring Plan and Results, </unittitle> <unitdate
                        type="inclusive">January-August 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">4</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix G: Summa Canister Analytical Data, </unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">5</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix H: NJ One Call Data Sheets, </unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">6</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix I: Tables, </unittitle> <unitdate
                        type="inclusive">February-June 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">7</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix J: Correspondence </unittitle> <unitdate
                        type="inclusive">April-August 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">8</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix L: Field Tests, </unittitle> <unitdate
                        type="inclusive">March-June 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">9</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix M: Glass Analysis Report, </unittitle> <unitdate
                        type="inclusive">November 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">10</container>
                    <unittitle>Remedial Action Selection Report for Parcel 2 of the Former Morristown Gas Works Site,  </unittitle> <unitdate
                        type="inclusive">December 2001.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">11</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 1: Site Location Map [1 of 6], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">12</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 2: Site Plan [2 of 6], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">13</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 3: Remedial Investigation Soil Sample Locations Map [3 of 6], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">14</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 4: Proposed Excavation Plan [4 of 6], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">15</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 5: Proposed Soil Cap  Plan [5 of 6], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">16</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 6: Proposed Conceptual Soil Cap Cross-Section A-A [6 of 6], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">17</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix B: Tables for Soil Analysis, </unittitle> <unitdate
                        type="inclusive">December 1997.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">18</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix C: Vision and Plan for the Morristown Greenway, </unittitle> <unitdate
                        type="inclusive">October 2000.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">19</container>
                    <unittitle>Remedial Action Workplan for Parcel 2 of the Former Morristown Gas Works Site, </unittitle> <unitdate
                        type="inclusive">November 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">20</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 1: Site Location Map [1 of 5], </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">21</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 2: Site Plan [2 of 5], </unittitle> <unitdate
                        type="inclusive">November 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">22</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 3: Remedial Investigation Soil Sample Locations Map [3 of 5], </unittitle> <unitdate
                        type="inclusive">November 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">23</container>
                    <unittitle>Former Morristown Gas Works Site: Figure 4: Proposed Excavation/Soil Cap Plan [4 of 5], </unittitle> <unitdate
                        type="inclusive">November 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">24</container>
                    <unittitle> Former Morristown Gas Works Site: Figure 5: Proposed Conceptual Soil Cap Cross- Section A-A [5 of 5], </unittitle> <unitdate
                        type="inclusive">November 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">25</container>
                    <unittitle>Former Morristown Gas Works Site: Appendix B: Tables for Soil Analysis, </unittitle> <unitdate
                        type="inclusive">December 1997.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">26</container>
                    <unittitle> Former Morristown Gas Works Site: Appendix C: Draft Deed Notice with Attached Maps of Affected Areas, Block 3504 Lot 1, </unittitle> <unitdate
                        type="inclusive">November 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">27</container>
                    <unittitle> Former Morristown Gas Works Site: Appendix D: Remediation Agreement Between PSEGSC and Morristown, </unittitle> <unitdate
                        type="inclusive">October 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">28</container>
                    <unittitle>Former Morristown Gas Works Site:Appendix E: Quality Assurance Plan, </unittitle> <unitdate
                        type="inclusive">November 2002.</unitdate> </did></c02>
                <c02><did> <container id="box4" type="box">4</container>
                    <container parent="box4" type="folder">29</container>
                    <unittitle>Former Morristown Gas Works Site Report on Parcel 4 and Affected Areas, </unittitle> <unitdate
                        type="inclusive">July 2003.</unitdate> </did></c02>
                     
            </c01>
            
            <c01 level="series"> <did> <unittitle>Series II: Goldere Junkyard and Hanover Compressor Station Upgrade, </unittitle> <unitdate
                type="inclusive">1999-2001.</unitdate> </did> 
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">1</container>
                    <unittitle>Remedial Action Report for the Goldere Junkyard,</unittitle> <unitdate
                        type="inclusive">January 2003.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">2</container>
                    <unittitle>Goldere Junkyard: Appendix A: Final Decision Document,</unittitle> <unitdate
                        type="inclusive">October 1999.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">3</container>
                    <unittitle>Goldere Junkyard: Appendix B: Correspondence between PSE&amp;G and NJDEP,</unittitle> <unitdate
                        type="inclusive">October 2000.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">4</container>
                    <unittitle>Goldere Junkyard: Figure 1 Site Location [1 of 4],</unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">5</container>
                    <unittitle>Goldere Junkyard: Figure 2 Site Layout Map [2 of 4], </unittitle> <unitdate
                        type="inclusive">January 2003.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">6</container>
                    <unittitle>Goldere Junkyard: Figure 3 Site Plan: Pre-Remedial Conditions [3 of 4], </unittitle> <unitdate
                        type="inclusive">January 2003.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">7</container>
                    <unittitle>Goldere Junkyard: Figure 4 Post Construction Drawing [4 of 4], </unittitle> <unitdate
                        type="inclusive">October 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">8</container>
                    <unittitle> Goldere Junkyard: Appendix D: Hazardous Waste Manifest </unittitle> <unitdate
                        type="inclusive">1971.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">9</container>
                    <unittitle>Goldere Junkyard: Appendix E: Backfill Documentation, </unittitle> <unitdate
                        type="inclusive">July-August 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">10</container>
                    <unittitle> Goldere Junkyard: Appendix F: Underground Storage Tank Closure Report, </unittitle> <unitdate
                        type="inclusive">October 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">11</container>
                    <unittitle>Goldere Junkyard: Appendix G: Photographs,</unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">12</container>
                    <unittitle>Hanover Compressor Station Upgrade:Environmental Reports 1-13,</unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">13</container>
                    <unittitle>Hanover Compressor Station Upgrade: Topographic Map, </unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">14</container>
                    <unittitle>Hanover Compressor Station Upgrade: Aerial Photograph, </unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">15</container>
                    <unittitle>Hanover Compressor Station Upgrade: General Plot Plan, </unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">16</container>
                    <unittitle>Hanover Compressor Station Upgrade: US Fish and Wildlife and NJDEP Historical Preservation Office Categorical Exclusion Agreement/ Exemption Letters, </unittitle> <unitdate
                        type="inclusive">March-December 2000.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">17</container>
                    <unittitle> Hanover Compressor Station Upgrade: Table of Adjacent Landowners, </unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">18</container>
                    <unittitle>Hanover Compressor Station Upgrade: Soil Erosion and Sediment Control Plan, </unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">19</container>
                    <unittitle>Hanover Compressor Station Upgrade: NJDEP Air Permit Revision Application, </unittitle> <unitdate
                        type="inclusive">February 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">20</container>
                    <unittitle>Hanover Compressor Station Upgrade: Hoover and Keith Inc., Noise Study,</unittitle> <unitdate
                        type="inclusive">March 2001.</unitdate> </did></c02>
                <c02 level="file"><did> <container id="box5" type="box">5</container>
                    <container parent="box5" type="folder">21</container>
                    <unittitle>Hanover Compressor Station Upgrade: Environmental Assessment,</unittitle> <unitdate
                        type="inclusive">not dated.</unitdate> </did></c02>
            </c01>
        </dsc>
    </archdesc>
</ead>